Album;
"Swift 1805/2015"
Photo shows the Cross Test Level fitted and installed on  the main beam  of the Keel Klamper.
Questions?
Comments?
Jerry G (Glickstein)
(Next step is to take down the bulkheads and check the center keel for flatness.
 
Posted by: chieftoolmaker@earthlink.net
| Reply via web post | • | Reply to sender | • | Reply to group | • | Start a New Topic | • | Messages in this topic (1) | 
